Unmatched Precision in 3D Modeling and Fabrication

Working with Eco Steel and Hydro on our recent commercial multi-story project was a game-changer. Their design team utilized Tekla Structures to provide millimetre-level BIM detailing and comprehensive clash detection before a single piece of steel was cut. When the fabricated components arrived from their Chitwan workshop, they were perfectly labeled ready-to-assemble kits. The CNC precision and quality of the welding meant our on-site erection time was drastically reduced. They truly understand the demands of seismic-resilient construction in Nepal.

Rajesh Shrestha
Project Lead, Apex Construction • 09 Feb, 2026

Leave us a Review

Download Brochure Chat on WhatsApp